What does the mechanical PM need to request, from whom, and before which part of the job? Start each register row with the document the specification asks someone to submit. Keep the section, page and paragraph beside it so the person taking over the estimate can check the wording.

Air handling units

In the Clinic sample, section 23 73 00, page 1, paragraph 1.01 A asks for shop drawings showing coil pull space and access door swings. Use that full description in the drawing request. A cut sheet with the unit dimensions still leaves the PM looking for the space needed to service it.

Paragraph 1.02 A calls for field verification of service clearances before fabrication. Put that check on the release checklist. At turnover, agree who will verify the clearance and who can release the drawing package.

Testing and balancing

Clinic section 23 05 93, page 1, paragraph 1.01 A calls for certified air balance reports for each occupied zone. Give that deliverable its own row. List the zones beside the report request so the PM can reconcile the returned package against the scope.

Paragraph 3.01 A calls for supply and return airflow readings at each terminal. Keep that field instruction beside the report row. Paragraph 1.02 A also calls for coordination with the controls contractor during functional testing. Confirm the testing window with that contractor before setting the report due date.

Check the front of the book before closeout

The Palatka project manual gives a separate example in section 01 33 00, PDF page 134, paragraph 1.10 A. It calls for two bound sets of operation and maintenance manuals before substantial completion unless individual sections specify otherwise. Paragraph F asks the team to combine general, mechanical and electrical material in the same binders when practicable.

For that job, enter the manual as a closeout deliverable, record the quantity and milestone, and agree who assembles the sets. Use the requirements from the book you are bidding.

Open the Clinic sample and find the words “coil pull space” in the first drawing request.